![](https://kinkaidcivil.com/wp-content/uploads/2022/06/8519583F-C550-4A9A-8B7C-A547D5C863C5_20211021000000_photos-1635208712.0136871-13-6c6a33-1024x768.jpg)
![](https://kinkaidcivil.com/wp-content/uploads/2022/06/04828C9D-D1D4-4975-BA97-3FD7544F0568_20220125000000_photos-1643160479.34593-3-9279df-768x1024.jpg)
![](https://kinkaidcivil.com/wp-content/uploads/2022/06/22435D74-582C-41BC-A75E-88BA7A1607EB_20220201000000_photos-1644203127.83892-21-b3068c-768x1024.jpg)
Role of the Firm: Subcontractor
Project’s Construction Cost: $47,000,000
Project Owner: TSMC
Services Utilized:
RGRCP Pipe, ADS Slotted Drains, Catch Basins (Various Types), Storm Drain Manholes, Lateral Connections, Headwalls, Sluice Gates, PVC Pipe, DIP Pipe, VCP Pipe, Sewer Manholes, Vertical Realignments, Pump Stations