Valleywise Health Center (Mesa)

Role of the Firm: Subcontractor
Project’s Construction Cost: $583,743.00
Project Owner: Valleywise Health

Services Utilized:
PVC Pipe, CMP Tanks, HDPE Pipe, Catch Basins, Drain Basins, RGRCP Pipe, Fire Hydrants, DIP Pipe, Copper (Type K), Sidewalk R&R, Curb & Gutter R&R, Asphalt R&R

Scroll to Top