![](https://kinkaidcivil.com/wp-content/uploads/2022/06/Valleywise-Mesa-16-1024x768.jpg)
![](https://kinkaidcivil.com/wp-content/uploads/2022/06/Valleywise-Mesa-18-768x1024.jpg)
![](https://kinkaidcivil.com/wp-content/uploads/2022/06/Valleywise-Mesa-21-768x1024.jpg)
Role of the Firm: Subcontractor
Project’s Construction Cost: $583,743.00
Project Owner: Valleywise Health
Services Utilized:
PVC Pipe, CMP Tanks, HDPE Pipe, Catch Basins, Drain Basins, RGRCP Pipe, Fire Hydrants, DIP Pipe, Copper (Type K), Sidewalk R&R, Curb & Gutter R&R, Asphalt R&R