Solid Cabinetry

Role of the Firm: Subcontractor
Project’s Construction Cost: $387,670.44
Project Owner: Riggs German, LLC

Services Utilized:
Single Curb, Curb & Gutter, Combination Sidewalk & Curb, Sidewalk, ADA Accessible Ramp, Screen Wall Footing, Access Gate Track, Valley Gutter and Apron, CMU Wall for Trash Enclosure, Sidewalk w/ Joint Pattern, Directional Curb Ramp, In-Line Access Ramp, Driveway, Sidewalk Scupper

Scroll to Top