Airport Gateway

Role of the Firm: Subcontractor
Project’s Construction Cost: $2,487,287.40
Project Owner: Airport Gateway South LLC

Services Utilized:
Curb & Gutter, Single Curb, Concrete Spillway, Sidewalk, ADA Ramp, Steel Tube Through Drain, Bike Pad, Light Pole Base, Valley Gutter, Wide Concrete Scupper, Valley Gutter, Driveway, Single Access Sidewalk Ramp, 40’ Scupper Pad, CMU Wall Footings

Scroll to Top