480-646-4438
Role: Subcontractor
Contract Amount: $881,613
Duration: 3 months
Scope: 1235 LF of waterline installation (3″-8″)
230 LF of sewer line installation
4004 LF of storm drain installation (12″-96″)
34 storm drain manhole & catch basin installations