Role: Sub Contractor
Contract Amount: $1,853,219
Duration: 18 months
Scope: 385 LF of waterline installation (12″-24″)
2861 LF of sewer line installation (8″-30″)
4 sewer manhole installations
1071 LF of sewer line removal
4980 LF of storm drain installation (18″-90″)
14 storm drain manhole installation