480-646-4438
Role: Subcontractor
Contract Amount: $868,716
Duration: 3 months
Scope: 4750 LF of waterline installation (3″-12″)
1722 LF of sewer line installation (6″-8″)
6 sewer manhole
4000 LF of storm drain installation (12″-120″)
25 storm drain catch basin installations